
Spend enough time in a fabrication shop in the GTA and you'll hear the words calibration, verification and adjustment used interchangeably. A customer requests a calibration certificate, an auditor wants to know whether your equipment has been verified, and a technician tells you he's adjusted the machine so it's reading correctly again.
They're three different things. Understanding the difference can save your shop from paying for unnecessary work or running into problems during a quality audit.
Calibration involves comparing what your welding machine displays against a known reference and recording the difference between the two readings. Verification determines whether the machine meets a specified requirement, giving you a pass or fail result. Adjustment involves physically changing something inside the machine or modifying a setting to correct an inaccurate reading.
You can calibrate a machine without adjusting it. You can also adjust a machine without properly calibrating it afterwards, although that's not a practice we'd recommend.
Welding machine calibration is the service most fabrication shops need regularly, but understanding what each activity involves will help you book the right service and get the documentation your shop actually needs.
Calibration is about measurement. Before making any changes to a welding machine, a technician needs to establish how accurately it's reading.
The power source is connected to a resistive load bank, which provides a steady, controlled load for testing. A live welding arc fluctuates too much to provide a reliable reference, which is why we use a load bank rather than simply striking an arc and watching the machine's display.
The technician compares the displayed voltage, current and wire feed speed against reference instruments that are themselves traceable to national standards.
Readings are taken at five points across the machine's operating range: the minimum, the maximum, and three evenly spaced points in between. We allow the machine to warm up, usually after about five minutes of running, before taking measurements. Each reading is repeated to make sure the results are stable and consistent.
What you get from calibration is a set of measurements.
For example, the machine might read 2 amps high at 200 amps, while the voltage display might be spot on. Neither reading automatically tells you whether the machine passes or fails. To determine that, you need to compare the measured error against the applicable tolerance.
Under IEC 60974-14, the international standard for arc welding equipment, there are two grades:
Most general fabrication work falls under standard grade. Precision grade is more commonly encountered in aerospace, nuclear and certain defence applications where the job specification demands tighter tolerances.
If your customer hasn't specified a grade, standard grade is generally the expectation. Still, it's worth confirming this before the technician starts testing. Finding out that your customer required precision grade after you've received a standard-grade calibration certificate creates unnecessary work for everyone involved.
The other major part of calibration is documentation. A proper calibration report identifies the machine, the date of testing, the reference instruments used, the readings at each test point and the measured errors.
When an auditor or a customer's quality manager asks for evidence that your welding equipment has been calibrated, that's the information they're looking for. Simply knowing that a technician checked the machine isn't enough when you're welding to a documented procedure.
Verification has a narrower purpose than calibration. You're checking whether a piece of equipment continues to meet the requirements it was purchased or configured to meet.
The result is a pass or fail.
Depending on what's being verified, a technician might check whether the welding output remains within specified limits, whether a safety cut-out functions correctly, or whether the machine performs according to the settings in your welding procedure.
Verification doesn't necessarily require the complete set of measured errors you'd receive from a calibration.
Think about an ordinary weighing scale. Calibration involves comparing its readings against a known weight and recording exactly how far off the readings are. Verification involves checking whether the reading falls within an acceptable limit.
The distinction is fairly straightforward once you've seen both procedures performed.
In a welding repair shop, calibration and verification often take place during the same service visit. The technician measures the machine's output, compares the measured errors against the applicable grade tolerance and determines whether the equipment passes verification.
What's written on the certificate matters. If the paperwork says "calibration certificate," an auditor will expect to see actual measurements, reference instruments and evidence of traceability. A document with nothing more than a pass box checked doesn't provide the same information.
There are also situations where verification makes sense outside your regular calibration schedule.
If a welding machine has been repaired, moved or dropped, it should be verified before being returned to production, even when its scheduled calibration isn't due yet. The same applies to a new machine being installed in your shop. You want to know that it's performing correctly before putting it into production.
IEC 60974-14 allows verification at installation and at any other interval the user considers appropriate. ISO 17662, which covers calibration, verification and validation of welding equipment, also calls for equipment to be re-checked following damage or repair.
Your shop can establish its own verification intervals, but those intervals need to be documented and followed.
Adjustment is where the technician actually makes a change to the welding machine.
Say we've calibrated a power source and found that it's reading 4% high, but the applicable tolerance is 2.5%. Depending on the machine and the source of the error, correcting that discrepancy might involve adjusting a trim pot, changing a control board setting or correcting an issue with a sensor.
That's adjustment. It's a repair action rather than a measurement procedure, and it's the only one of the three activities that physically changes the machine or its settings.
One mistake shops make is assuming that once a machine has been adjusted, it's automatically within tolerance. Without taking another set of measurements, there's no way to establish that.
The correct sequence is:
That final step is essential. Otherwise, you've changed something inside the machine without establishing whether the correction was accurate.
Repairs can also affect your regular calibration schedule. Replacing a circuit board, changing a shunt or replacing a control assembly can affect the accuracy of the machine's settings.
Any repair or modification that could affect those settings means the equipment should be re-calibrated and re-verified before returning to production.
The calibration schedule then restarts from the repair date rather than the previous scheduled calibration date.
You'll also come across the term validation, particularly when dealing with customer specifications and welding equipment standards.
Under IEC 60974-14, validation means demonstrating that a set value meets the reference value within specified limits.
For example, if you set a welding machine to 200 amps, validation determines whether the machine actually delivers an output within the permitted tolerance of 200 amps.
In everyday shop conversation, technicians and quality managers sometimes use the word validation to describe the entire calibration and checking procedure. You'll hear this particularly when discussing older welding machines equipped with analogue meters and graduated scales.
The technical distinction under the standard is that calibration deals with displayed values, while validation deals with set values.
For the person operating the welding machine, that might seem like a minor difference. For the person responsible for quality documentation, it's worth getting right.
If your customer's specification or welding procedure calls for validation, the testing method and certificate should reflect that requirement. If calibration is specified, the report should document the measured values against a reference.
Ask your service provider what procedure they'll be performing and what information will appear on the certificate before booking the work. An experienced welding equipment technician should be able to explain the difference without making the process unnecessarily complicated.
Not every welding machine needs to be calibrated at the same interval.
ISO 17662 considers once a year to be the typical calibration frequency, with adjustments to that interval based on the equipment's reliability records.
For instance, a machine that has consistently maintained its readings for three years running may justify a longer calibration interval. On the other hand, if a power source repeatedly drifts outside tolerance every six months, there's a good reason to check it more frequently.
IEC 60974-14 calls for validation at least every year and following any repair or modification that could affect the machine's settings.
In practice, four factors determine how frequently your welding equipment should be checked:
A welding machine used for pressure vessel fabrication or structural steel work under a CWB-certified quality system will generally be subject to a tighter schedule than a machine used for occasional repairs in a maintenance bay.
Operating conditions make a difference, too. Equipment that's regularly transported between job sites, knocked around in the back of a truck or operated in a dusty fabrication shop will drift faster than equipment permanently installed in a clean welding bay.
Look at your previous calibration reports. If the last three calibrations show roughly the same small error, your current interval is probably appropriate. If the measured error continues to increase with each inspection, consider shortening the interval.
Verification is a little different because it's often triggered by an event rather than a scheduled date. Verify equipment when it's installed, following repairs, after moving it, following a fault that could affect output, or whenever weld quality problems give you reason to suspect the equipment rather than the operator.
Checking the machine is considerably less expensive than reworking an entire batch of welds.
When a customer calls our shop asking for welding machine calibration, there are several things we need to establish before we can determine the scope of the work.
Knowing the answers to these five questions ahead of time makes the process much easier:
It also helps to have the equipment information available when you call.
Have the make and model, serial number or code, welding process and setup, input power, and any fault codes or display messages ready. If the machine isn't operating correctly, describe exactly what it's doing.
The information we need to arrange calibration is largely the same information we need when diagnosing a welding machine for repair.
The cost of welding machine calibration depends on the equipment and the amount of testing required.
A small MIG power source brought into our shop for voltage and current calibration is a relatively straightforward job. A multi-process welding machine that needs its wire feed speed and gas flow checked across its full operating range requires more time.
The same applies when we're calibrating a fleet of welding machines at a customer's facility.
Onsite calibration involves travel and equipment setup. If a machine fails its initial calibration and requires adjustment followed by a second calibration pass, that also adds time to the job.
Typical prices for single-machine calibration in the GTA range from a few hundred dollars for a straightforward in-shop check into higher figures for larger welding machines, multi-parameter testing or onsite fleet work.
Use those figures for planning purposes rather than treating them as a formal quote. The actual cost depends on the scope of testing.
Part of what you're paying for is the reference equipment, its calibration traceability and the documentation required to demonstrate that your equipment has been properly tested.
There's another cost worth considering: what happens when equipment isn't checked regularly.
A welding machine reading 5% low on current can cause insufficient penetration without the operator realizing what's happening. The problem may only become apparent when a weld fails inspection or, in a worse situation, fails in service.
Rejected welds, production delays, rework and failed audits are all more expensive than having your welding machine calibrated. From a production standpoint, that's one of the strongest reasons to maintain a consistent calibration schedule.
| Activity | What it does | What you get | When it happens |
|---|---|---|---|
| Calibration | Compares displayed values against a traceable reference | Measured errors at five points, with a report | On schedule, typically yearly |
| Verification | Checks whether the machine meets a stated requirement | Pass or fail against a limit | At installation, after repair or a move, on schedule |
| Adjustment | Changes the machine so it reads correctly | A machine brought back within tolerance | When calibration finds an error outside tolerance |
| Validation | Demonstrates that a set value is delivered within limits | Confirmation that the machine delivers the specified settings | With calibration, per IEC 60974-14 |
At Link Technical Arc Services, we approach welding machine calibration the same way we approach equipment repairs. We establish what's happening with the machine, explain our findings and let the customer decide how to proceed.
Depending on the equipment and its application, we check voltage, current, wire feed speed and gas flow using reference instruments with traceable calibration. Testing is performed across five points on a resistive load to obtain stable, repeatable readings.
If we find a machine that's outside tolerance, we'll explain the measured error, what needs to be adjusted and what's involved in bringing the equipment back within tolerance.
Once the adjustment is completed, we test the machine again. The calibration certificate should reflect the condition of the equipment when it leaves our shop, not the condition it was in when it arrived.
Link Technical Arc Services is an authorized service/repair centre for Lincoln Electric, Miller, ESAB and Forney in Canada, and an Approved Warranty Centre with factory-trained technicians.
We offer free diagnostics both at our shop in Concord and onsite at customer facilities. Whether you bring your welding machine to us or arrange for a technician to visit your shop, there's no charge for the diagnostic itself.
If your equipment requires calibration, verification or adjustment following a repair, we'll provide a quote before proceeding with the work. You'll know what's involved before authorizing anything.
To schedule your equipment for testing, visit our welding machine calibration service page or contact us to discuss your requirements.
Have the machine's make, model and serial number available, along with the welding process you're running and any standard or grade specified by your customer. With that information, we can explain what testing is required and what your calibration certificate will include.
If you're considering calibration because your equipment has already started giving you trouble, our guide to welding machines that won't weld covers some of the initial checks worth making before booking a service appointment.
For fabrication shops looking to better understand the quality control and auditing requirements surrounding their equipment, we've also covered why welding machine calibration matters in Toronto's industrial sector.
You can read our guide on how often welding machines should be serviced for general maintenance information, or visit our TIG, MIG and stick welder repair service page if your equipment requires repair.
Additional troubleshooting and equipment maintenance guides are available on our blog.
No. Calibration involves comparing the displayed values on a welding machine against a traceable reference and documenting the measured errors at several test points.
Verification determines whether the machine meets a specified requirement and provides a pass or fail result.
Calibration establishes how accurate the machine is. Verification determines whether that level of accuracy is acceptable. Most fabrication shops need both activities performed, and the certificate should clearly identify which procedures were completed.
Typically once a year, which is the normal calibration frequency under ISO 17662.
However, the appropriate interval depends on your customer's requirements, your quality management system, how frequently and heavily the equipment is used, and the results of previous calibrations.
If a welding machine undergoes a repair or modification that could affect its settings, it should be re-calibrated regardless of when its next scheduled calibration is due.
Calibration measures and documents the error between the welding machine's displayed values and a known reference. Adjustment involves changing the machine to correct that error.
Once an adjustment has been made, the equipment must be calibrated again to establish whether the correction was successful.
Without those final measurements, there's no documented evidence that the machine has been brought back within tolerance.
That depends on your customer's requirements and the specifications outlined in your welding procedure.
Under IEC 60974-14, calibration applies to displayed values, while validation applies to set values. In practice, both procedures are usually completed during the same service visit.
Check which terminology your customer uses in their specification and make sure the testing procedure and certificate reflect that requirement.
At minimum, a welding machine calibration certificate should include the following information:
If your certificate is missing any of this information, ask your service provider to supply it. It's much easier to resolve missing documentation when the work is completed than to try to track it down during a quality audit.